Volume 5A: Pipelines, Risers, and Subsea Systems 2019
DOI: 10.1115/omae2019-95057
|View full text |Cite
|
Sign up to set email alerts
|

Tie-in of a Rigid Pipeline to a Flexible Rise: Design and Installation — Challenges and Lessons Learnt

Abstract: This paper presents the experience made with the engineering and execution of the tie-in of flexible risers to rigid pipelines on a project recently completed in West Africa. Five production and injection pipelines (10” and 6”) were tied back to the host platform with flexible risers, in Lazy wave configurations, in ∼600m water depth. The risers are directly connected to the terminations structures (PLETs) of the rigid pipelines, through horizontal connection systems. … Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles