2015
DOI: 10.6106/jcepm.2015.5.1.026
|View full text |Cite
|
Sign up to set email alerts
|

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2025
2025

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 4 publications
0
5
0
Order By: Relevance
“…Papers used a variety of machine learning algorithms in their investigation. Examples were found of support vector machine (Cheng and Hoang, 2014;Cheng et al, 2010a, b;El-Sawalhi, 2015;Kong et al, 2008;Petruseva et al, 2017;Petruvesa et al, 2013;Wauters and Vanhoucke, 2014), neural networks (Darko et al, 2023;Kim et al, 2004;Naik and Radhika, 2015;Petroutsatou et al, 2012;Wang et al, 2012;Yahia et al, 2011), random forest (Shoar et al, 2022;Yaseen et al, 2020) and regression (Kim et al, 2004(Kim et al, , 2013Mahmoodzadeh et al, 2022;Petruseva et al, 2017;Yip et al, 2014). No consistent findings were evident in what type of algorithm worked best given particular characteristics of the investigation dataset in conjunction with specific predicted characteristics, size or sectoral base.…”
Section: Data Analyticsmentioning
confidence: 99%
“…Papers used a variety of machine learning algorithms in their investigation. Examples were found of support vector machine (Cheng and Hoang, 2014;Cheng et al, 2010a, b;El-Sawalhi, 2015;Kong et al, 2008;Petruseva et al, 2017;Petruvesa et al, 2013;Wauters and Vanhoucke, 2014), neural networks (Darko et al, 2023;Kim et al, 2004;Naik and Radhika, 2015;Petroutsatou et al, 2012;Wang et al, 2012;Yahia et al, 2011), random forest (Shoar et al, 2022;Yaseen et al, 2020) and regression (Kim et al, 2004(Kim et al, , 2013Mahmoodzadeh et al, 2022;Petruseva et al, 2017;Yip et al, 2014). No consistent findings were evident in what type of algorithm worked best given particular characteristics of the investigation dataset in conjunction with specific predicted characteristics, size or sectoral base.…”
Section: Data Analyticsmentioning
confidence: 99%
“…Another study predicting the duration and cost of highway road projects was proposed by the authors in [ 81 ] using ANN. Data for model training were taken from past projects in which all items were uniform.…”
Section: Applications Of Artificial Intelligence In Civil Construcmentioning
confidence: 99%
“…This model was then validated and the results indicate a better estimate of the realistic cost of highway projects in Libya. Naik and Radhika (2015) developed different ANN models for project cost and duration estimation. Hyari et al (2015) presented an ANN model for the conceptual cost estimation of engineering services for public construction projects involving both design and construction supervision costs.…”
Section: Literature Reviewmentioning
confidence: 99%