Time and Motion Study for Solar Contractors

Abstract: One of the main goals of the solar energy industry is making solar technologies cost-competitive with other forms of energy. In particular, balance-ofsystem (BoS) costs associated with the installation of photovoltaic (PV) systems require significant cost savings to stay competitive with conventional energy sources. Significant potential for cost savings exists through increasing the productivity of the labor force installing the system. A gap in knowledge exists regarding approaches to measuring and improving… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 3 publications
1
4
0
Order By: Relevance
“…• Flashing and PV system installation is the most time-intensive stage of the RIPV installation process. PV system installation and flashing accounts for around 60% of the installation process for an average system and is consistent with the findings of Quintanilla et al (2014) for conventional systems.…”
Section: Discussionsupporting
confidence: 86%
See 4 more Smart Citations
“…• Flashing and PV system installation is the most time-intensive stage of the RIPV installation process. PV system installation and flashing accounts for around 60% of the installation process for an average system and is consistent with the findings of Quintanilla et al (2014) for conventional systems.…”
Section: Discussionsupporting
confidence: 86%
“…• Our time and motion results suggest that RIPV systems can be installed more quickly than conventional rooftop PV systems due to synergies with reroofing and new construction. The average total process times in our study were 6.4 and 3.5 worker-hours per kW for the reroofing and new construction sites, respectively, compared to an estimated 6.9 worker-hours per kW for conventional, retrofit residential rooftop PV from a previous study (Quintanilla et al, 2014). However, that study was completed in 2014, and a more recent analysis is necessary to ensure that installation times are still comparable.…”
Section: Discussionmentioning
confidence: 56%