Time and Resource Management of Residential Apartment Construction using Building Information Modeling

Abstract: To complete a project under the complicated situations, it is important to follow effective ways to use available tools and methods, taking into account present technology and management. Also, it is challenging to prepare accurate and achievable plans in large construction projects. Visualizing forms at an early stage in building design improves the ability of designers to deliver ideas and the capability to inspect and assess the methods helps to predict and optimize the actual presentation of the constructi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 9 publications
0
6
0
Order By: Relevance
“…This reduces cost overruns and delays. [41,42] BIM may minimize the time required to finish a building project by giving precise and thorough information about the project. This may assist in eliminating construction mistakes, rework and delays, resulting in speedier project completion timeframes.…”
Section: Sr # Success Factorsmentioning
confidence: 99%
See 3 more Smart Citations
“…This reduces cost overruns and delays. [41,42] BIM may minimize the time required to finish a building project by giving precise and thorough information about the project. This may assist in eliminating construction mistakes, rework and delays, resulting in speedier project completion timeframes.…”
Section: Sr # Success Factorsmentioning
confidence: 99%
“…[37,38] 12 BIM provides precise project information to optimize material utilization [46] 13 BIM enhances construction project sequencing, resulting in productivity improvements. [41,42] 14 BIM helps improve safety planning by providing accurate and complete project information. [39,40] 15 BIM's 3D model may prevent construction conflicts.…”
Section: Sr # Success Factorsmentioning
confidence: 99%
See 2 more Smart Citations
“…Undeterred by these BIM-based delay analysis studies with corresponding benefits of BIM to construction projects, there is no amalgamating study that has consolidated key drivers that affect BIM-based construction projects. As a result, using delay risk drivers from BIM-based construction projects is crucial and has been actively promoted in AEC to accomplish early prediction, which is necessary in any robust predictive modelling to provide adequate time for correction (Narlawar et al, 2019) (Amany et al, 2020). Consequently, this study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying the most critical delay risk drivers for BIM-based construction projects.…”
Section: Introductionmentioning
confidence: 99%