Application of Mathematics and Optimization in Construction Project Management 2021
DOI: 10.1007/978-3-030-81123-5_5
|View full text |Cite
|
Sign up to set email alerts
|

Time –Cost Trade-off Optimal Approaches

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 147 publications
0
1
0
Order By: Relevance
“…Since Babu and Suresh [1] first proposed the linear programming model of timelimit-cost-quality equilibrium optimization, the problem of achieving appropriate balance among the three objectives has received a lot of attention, and a lot of research has been conducted. Research into an optimization model of the balance between engineering project duration, cost, and quality is a relevant research direction [2][3][4][5][6], as is research into optimization-model-solving algorithms [7,8], and research into algorithm synthesis [9,10].…”
Section: Introductionmentioning
confidence: 99%
“…Since Babu and Suresh [1] first proposed the linear programming model of timelimit-cost-quality equilibrium optimization, the problem of achieving appropriate balance among the three objectives has received a lot of attention, and a lot of research has been conducted. Research into an optimization model of the balance between engineering project duration, cost, and quality is a relevant research direction [2][3][4][5][6], as is research into optimization-model-solving algorithms [7,8], and research into algorithm synthesis [9,10].…”
Section: Introductionmentioning
confidence: 99%