2007
DOI: 10.1080/02533839.2007.9671323
|View full text |Cite
|
Sign up to set email alerts
|

Time delayHcontrol of structures under earthquake loading

Abstract: In this paper, an H ∞ control algorithm is developed to reduce the earthquake response of structures with consideration of control force execution time delay. To achieve optimal control performance and assure control system stability, the strategy to select two control parameters γ and α is extensively investigated. It was found that the decrease of γ or increase of α results in significant reduction of structural responses. To obtain the same control results, a larger α has to be selected for stiff structures… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2009
2009
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 25 publications
0
5
0
Order By: Relevance
“…It shows that the LQR control is a special case of the proposed H ∞ control (Lin et al, 2006(Lin et al, , 2007.…”
Section: H ∞ Control Algorithmmentioning
confidence: 97%
See 4 more Smart Citations
“…It shows that the LQR control is a special case of the proposed H ∞ control (Lin et al, 2006(Lin et al, , 2007.…”
Section: H ∞ Control Algorithmmentioning
confidence: 97%
“…According to Lin et al (2007), for a SDOF controlled structure, the upper bound of α corresponding to infi nite delay time, called α td , satisfi es the following equation …”
Section: Time Delay Effectmentioning
confidence: 98%
See 3 more Smart Citations