2008
DOI: 10.1016/j.compgeo.2007.04.004
|View full text |Cite
|
Sign up to set email alerts
|

Time-settlement behaviour of piled raft foundations using infinite elements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0
1

Year Published

2010
2010
2019
2019

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 38 publications
(3 citation statements)
references
References 13 publications
0
2
0
1
Order By: Relevance
“…Feng et al developed a method to calculate the post‐construction settlement of a bridge pile foundation using Mesri creep model. Feng et al developed a nonlinear method based on modified Burger model for the prediction of creep settlement of pile groups in layered soil. Li et al investigated the time‐dependent settlement of single piles using wave equation analysis program based on traveling wave decomposition.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Feng et al developed a method to calculate the post‐construction settlement of a bridge pile foundation using Mesri creep model. Feng et al developed a nonlinear method based on modified Burger model for the prediction of creep settlement of pile groups in layered soil. Li et al investigated the time‐dependent settlement of single piles using wave equation analysis program based on traveling wave decomposition.…”
Section: Introductionmentioning
confidence: 99%
“…Several analytical, numerical, and experimental studies have been made on the immediate settlement of single piles and pile groups that are capable of predicting immediate settlements with good accuracy. However, studies on time‐dependent settlements have been limited owing to its complexity and the assumption that it accounts for only an insignificant proportion of the total settlement. It is however essential to investigate the long‐term settlement for structures such as railway and highway bridges, nuclear power plants, and other important structures because excessive settlements may create severe safety issues.…”
Section: Introductionmentioning
confidence: 99%
“…Bajad & Sahu (2008) apresentaram os resultados de um estudo experimental (1g) concluindo que a distribuição da carga e o recalque são os parâmetros mais influenciados pelo comprimento das estacas e que algumas metodologias, como a de Poulos & Davis (1980), permitem avaliar a relação entre o número de estacas e o recalque médio, fornecendo um método rápido de avaliação do projeto. Small & Liu (2008) apresentaram um estudo numérico (Elementos Finitos) incluindo o adensamento na análise, o solo como material elástico e elementos de adensamento infinito nas bordas. Lee et al (2010) apresentaram um modelado tridimensional em ABAQUS do comportamento de sistemas radier estaqueado submetidos a carga vertical, em argilas moles.…”
Section: -Grupos De Estacas E Sistemas Radier Estaqueado Em Solos Moles Com Adensamentounclassified