Towards a critical design of an operational ground segment for an Earth observation mission

Abstract: The ground segment for the future remote sensing mission Environmental Mapping and Analysis Program (EnMAP; www.enmap.org) is developed by the Earth Observation Center and the German Space Operations Center at the German Aerospace Center. The launch is scheduled for 2017. An operational satellite ground segment is a highly complex heterogeneous system which has to cope with different levels of criticality, novelty, specificity, and to be operated for many years. It consists of equipment, hard-and software as w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
11
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
5
3
1

Relationship

3
6

Authors

Journals

citations
Cited by 19 publications
(11 citation statements)
references
References 16 publications
0
11
0
Order By: Relevance
“…The setup and operation of the EnMAP ground segment is under the responsibility of the Earth Observation Center (EOC) and the German Space Operations Center (GSOC) at the DLR [52]. The ground segment completed its design phase by successfully passing the critical design review in 2010 and is now in production phase.…”
Section: Ground Segmentmentioning
confidence: 99%
“…The setup and operation of the EnMAP ground segment is under the responsibility of the Earth Observation Center (EOC) and the German Space Operations Center (GSOC) at the DLR [52]. The ground segment completed its design phase by successfully passing the critical design review in 2010 and is now in production phase.…”
Section: Ground Segmentmentioning
confidence: 99%
“…The first mission to use Incremental Planning, including a Timeline Manager that implements Robust Commanding, is foreseen to be EnMAP. 4 Glossary uplink contact One possibility to command the spacecraft/executing unit, e. g. one ground station contact.…”
Section: Discussionmentioning
confidence: 99%
“…Second, the space segment is responsible for producing the bus and the hyperspectral imager, its integration and testing, as well as the launch; these activities are led by OHB System AG. Third, the ground segment [10][11][12] links the user and space segment by providing facilities and systems for operating the satellite and retrieval of the targeted scientific data; it is led by the Earth Observation Center (EOC) and the German Space Operations Center (GSOC) at DLR.…”
mentioning
confidence: 99%
“…Second, the Processor, Calibration, and Validation System (PCV) is responsible for developing the hyperspectral processing chain for radiometrically calibrated, spectrally characterized and geometrically corrected imaging products [11,13]; this system is coordinated by the Remote Sensing Technology Institute (IMF) at DLR. Third, the Payload Ground System (PGS) is responsible for data reception, processing and archiving, as well as to establish a web interface to the scientific user community [14]; it is established by the German Remote Sensing Data Center (DFD) at DLR.…”
mentioning
confidence: 99%