2015 7th International Workshop on Science Gateways 2015
DOI: 10.1109/iwsg.2015.8
|View full text |Cite
|
Sign up to set email alerts
|

Towards an Industry Data Gateway: An Integrated Platform for the Analysis of Wind Turbine Data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
4
2
1

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(10 citation statements)
references
References 14 publications
0
10
0
Order By: Relevance
“…The first automatically built cluster comprises the seven use cases no. 2 [41], 3 [42], 5 [38], 6 [71], 8 [48], 37 [61] and 39 [63]. One particularity of the cases located in this cluster that was noticed at the very beginning of the examination and comparison, was the aim to improve already existing analysis processes.…”
Section: ) Description Of Clustermentioning
confidence: 95%
See 1 more Smart Citation
“…The first automatically built cluster comprises the seven use cases no. 2 [41], 3 [42], 5 [38], 6 [71], 8 [48], 37 [61] and 39 [63]. One particularity of the cases located in this cluster that was noticed at the very beginning of the examination and comparison, was the aim to improve already existing analysis processes.…”
Section: ) Description Of Clustermentioning
confidence: 95%
“…On the other side, the improvement of existing processes can be defined as achieving better quality of the performed analysis. This can be realized by using all of the available information, like unstructured medical and genome data on the way to personalized medicine [63], investigating the meaning of social media data to improve crisis mapping systems [41] or the broadening of the scope [61].…”
Section: ) Description Of Clustermentioning
confidence: 99%
“…Software, tools, and frameworks for faster simulation and optimization are also highly desired. Benefited from the advancement of data analytics techniques, several data-driven optimization algorithms are proposed for the design tasks for wind and hydro turbines [121][122][123][124]. Moreover, the development of computational infrastructures, such as HPC, enhances the evaluation efficiency for complex models from hardware-level [125,126].…”
Section: Energy Production Devicesmentioning
confidence: 99%
“…VAVID [25] is a science gateway that is based on MoSGrid and tailored to use cases related to wind energy power stations and car crash simulations. In VAVID an integration with Unity is currently being developed to be used with a LDAP authentication source.…”
Section: Authentication and Securitymentioning
confidence: 99%