2022
DOI: 10.1016/j.jclepro.2022.134069
|View full text |Cite
|
Sign up to set email alerts
|

Towards smart and sustainable urban management: A novel value engineering decision-making model for sewer projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 15 publications
(9 citation statements)
references
References 44 publications
0
9
0
Order By: Relevance
“…The questionnaire contained three sections. Section one collated the demographic profile of respondents; section two gathered quantitative interval data on a 5-point Likert scale to measure the CSFs of cyber technology (Table 1), where 5 = extremely high, 4 = high, 3 = average, 2 = small, and 1 = no or very small, as frequently used in previous studies [43][44][45][46][47]; and section three gathered qualitative openended data on questions that sought further information on the essential CSFs identified. To ensure robust ethical compliance, all participants were assured that all data would be kept strictly confidential, no personal details would be divulged nor disseminated, and data collected would be retained on a secure server and destroyed upon completion of this investigation.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The questionnaire contained three sections. Section one collated the demographic profile of respondents; section two gathered quantitative interval data on a 5-point Likert scale to measure the CSFs of cyber technology (Table 1), where 5 = extremely high, 4 = high, 3 = average, 2 = small, and 1 = no or very small, as frequently used in previous studies [43][44][45][46][47]; and section three gathered qualitative openended data on questions that sought further information on the essential CSFs identified. To ensure robust ethical compliance, all participants were assured that all data would be kept strictly confidential, no personal details would be divulged nor disseminated, and data collected would be retained on a secure server and destroyed upon completion of this investigation.…”
Section: Methodsmentioning
confidence: 99%
“…A convenience sampling technique was used in the research to ensure that there is an equal chance of every member being selected. Moreover, a methodological purpose analysis was used to determine the sample size [43,49]. The questionnaire was administered to 119 people using a postal survey and 98 completed questionnaires were retrieved, constituting an 82% response rate.…”
Section: Methodsmentioning
confidence: 99%
“…A major cause of delayed payment can be attributed to the Client's poor financial management [32]. Funding infrastructure projects require sizable investments, and in the absence management and financial controls, moral adversities are likely to occur in the procurement of goods and services by public and private entities.…”
Section: Theoretical Foundationmentioning
confidence: 99%
“…In Ghana, complicated contractual processes and the client's poor financial management are critical delayed payments causative factors [41]. The neighbouring region of Nigeria, Odenigbo et al [56] found that submission of claims with errors and slow variation approval processes occur frequently In Malaysia, numerous significant causes of delayed payments to contractors were identified and mirror issues occurring in T&T, such as the client's poor financial management, contractual disputes and cultural attitudes [32]. These similar causations experienced amongst all these countries all contributes to the deliberate withholding of payments to contractors.…”
Section: Failure To Perform Work In Accordance With the Contract Pres...mentioning
confidence: 99%
“…Given the current technology, as mentioned above, centralized organic matter handling provides considerable scale savings. However, a decentralized system might not reach the requisite economy of scale (Kineber et al., 2022).…”
Section: Integrated Systemsmentioning
confidence: 99%