2018
DOI: 10.1109/tim.2018.2792890
|View full text |Cite
|
Sign up to set email alerts
|

Trade-offs in PMU and IED Deployment for Active Distribution State Estimation Using Multi-objective Evolutionary Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
42
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 59 publications
(42 citation statements)
references
References 34 publications
0
42
0
Order By: Relevance
“…Remark 3. Problem (10) is equivalent to minimizing the number of sensors or the total cost of the sensors, while enforcing a given accuracy, i.e., satisfying a performance threshold λ of the metric: min {x|f (x)≤λ, xi∈{0,1} ∀i} h(x), as in [15]- [18]. To achieve that, the problem (10) can be solved for different numbers of sensors or budgets until the performance value is below the threshold:…”
Section: B Measurementsmentioning
confidence: 99%
“…Remark 3. Problem (10) is equivalent to minimizing the number of sensors or the total cost of the sensors, while enforcing a given accuracy, i.e., satisfying a performance threshold λ of the metric: min {x|f (x)≤λ, xi∈{0,1} ∀i} h(x), as in [15]- [18]. To achieve that, the problem (10) can be solved for different numbers of sensors or budgets until the performance value is below the threshold:…”
Section: B Measurementsmentioning
confidence: 99%
“…1). From (11) and (12), it can be found that the covariance is zero when branch b is not downstream branch j (or vice versa), whereas it is equal to the variance of branch b (or j) if this is downstream branch j (or b). It is worth noting that in the latter case it is Ψ = Γ b (or Ψ = Γ j ).…”
Section: Impact Of Pseudo-measurementsmentioning
confidence: 99%
“…The use of heterogeneous devices with different costs and accuracy characteristics, including last generation Phasor Measurement Units (PMUs), is also investigated in other papers (e.g. [9]- [11]). In [12], the uncertainties in the network parameters are also taken into account in addition to the meters uncertainties to ensure the achievement of the desired accuracy targets.…”
Section: Introduction Distribution System State Estimation (Dsse) mentioning
confidence: 99%
“…In literature, some alternative solutions have been developed with the aim of reducing the total measurement infrastructure costs. For example, in [16], in order to find a good tradeoff between measurement equipment costs and SE accuracy, a hybrid solution is proposed based on the use of different kinds of meters. In [25], the use of LV smart meter measurements is also considered, in order to save the costs of additional MV measurement system installation.…”
Section: Meter Placement Techniques and Measurement Systems For Distrmentioning
confidence: 99%
“…The determination of the best possible combination of meters for distribution system monitoring is referred to as the optimal meter placement (MP) [8][9][10][11][12][13][14]. For the measurement of the SE input data, different kinds of measurement equipment can be used, i.e., phasor measurement units (PMUs), smart meters (SMs), power quality analyzers (PQAs) and so on, with different accuracy features and costs [15,16]. Missing data are integrated with pseudo-measurements, exploiting historical information or an a priori estimate of the relative power magnitude of each load [17][18][19][20].…”
Section: Introductionmentioning
confidence: 99%