2007
DOI: 10.1007/s10853-006-0190-9
|View full text |Cite
|
Sign up to set email alerts
|

Transient liquid phase bonding of steel using an Fe–B interlayer

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2008
2008
2011
2011

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 17 publications
(10 citation statements)
references
References 14 publications
0
10
0
Order By: Relevance
“…The bonding process is usually confined in a vacuum [3-5, 7, 12, 14-17, 20-30, 35, 38-40, 46-58, 61-63, 65, 66, 68-72, 76-83, 86-88, 93-100, 103-105, 108, 110, 112-115, 117, 119, 122-127, 130, 132-138, 140-157], although an inert atmosphere, such as argon, can be used [6,11,14,32,33,43,45,60,67,74,75,90,111,121,134,158,159]. On rare occasions, TLP bonding is performed under a different atmosphere, such as nitrogen [44], hydrogen [160], nitrogen and hydrogen [18], or open air [129].…”
Section: Tlp Bonding Processmentioning
confidence: 99%
See 2 more Smart Citations
“…The bonding process is usually confined in a vacuum [3-5, 7, 12, 14-17, 20-30, 35, 38-40, 46-58, 61-63, 65, 66, 68-72, 76-83, 86-88, 93-100, 103-105, 108, 110, 112-115, 117, 119, 122-127, 130, 132-138, 140-157], although an inert atmosphere, such as argon, can be used [6,11,14,32,33,43,45,60,67,74,75,90,111,121,134,158,159]. On rare occasions, TLP bonding is performed under a different atmosphere, such as nitrogen [44], hydrogen [160], nitrogen and hydrogen [18], or open air [129].…”
Section: Tlp Bonding Processmentioning
confidence: 99%
“…• Heating to the bonding temperature, CP1-5a: less than a minute to about an hour; dependent on the method of heating, the heating rate of the heating apparatus, and the substrate material's thermal properties • Melting of the interlayer, CP3: less than a second [121,124,138] to several seconds [19,43,77] • Melting back of the substrate, CP3-5a: seconds [11,71,73,77,124,138,161,174] to minutes [7,36,37,43,71,73,85,121] • Isothermal solidification, CP5a-5c: minutes [7,25,36,37,56,74,77,95,96,105,121,125,153] to hours [7,11,33,36,37,43,57,58,105,146,157,175], although it can occur in less than a minute …”
Section: Time Frame Of Tlp Bondingmentioning
confidence: 99%
See 1 more Smart Citation
“…In addition, amorphous layers improve the contact with the tubes when pressure is applied, whereas crystalline layers break. From previous works [5,8], we know that for low carbon steel tubes, Fe 96.2 B 3.8 wt.% amorphous foils of 20 μm thickness as filler material, an applied pressure of 4 MPa and a holding time of 7 min at T P ≈ 1, 250 • C, the solidification process was completed. From now on, this pressure and thermal cycle are referred as standard procedures.…”
Section: Physical Description-transient Liquid Phase Bonding (Tlpb)-bmentioning
confidence: 99%
“…[32] Nishimoto et al [32] reported that K is 0.09, 0.80, and 6.75 at 1373. 15 [25,[28][29][30] is one third of that in Ni (0.3 at. pct).…”
Section: B No Bn Precipitates In the Bonding-affected Zonementioning
confidence: 99%