2017
DOI: 10.3384/ecp17138355
|View full text |Cite
|
Sign up to set email alerts
|

Transient stability of fault ride through capability of a transmission system of a distributed hydropower system

Abstract: This paper describes the Fault Ride Through (FRT) capability of generators of a part of the 132 kV high voltage power network in Telemark region, Norway using a simplified power system simulator model. The organization, "European network of transmission system operators for electricity" (ENTSO-e) is introducing a network code for the Transmission System Operators (TSO) in Europe where the upper limit of the FRT requirement for 132 kV system is 0.25 s. However, according to the Norwegian network code, this limi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?