2003 IEEE 10th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance, 200
DOI: 10.1109/tdcllm.2003.1196462
|View full text |Cite
|
Sign up to set email alerts
|

Transmission line emergency restoration philosophy at Los Angeles Department of Water and Power

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 0 publications
0
1
0
Order By: Relevance
“…The project reviewed in this study is one of the Network Transmission Reconductoring projects at PT PLN (Persero) SUTT 150 kV Sukatani New towards Sukatani 4-CIRCUIT OHL 2 X TACSR 410/67 mm2 (Krishnasamy et al, 1981;Riba et al, 2020;Schweiner et al, 2003).…”
Section: Results and Discussion Field Datamentioning
confidence: 99%
“…The project reviewed in this study is one of the Network Transmission Reconductoring projects at PT PLN (Persero) SUTT 150 kV Sukatani New towards Sukatani 4-CIRCUIT OHL 2 X TACSR 410/67 mm2 (Krishnasamy et al, 1981;Riba et al, 2020;Schweiner et al, 2003).…”
Section: Results and Discussion Field Datamentioning
confidence: 99%
“…Previously, such investment was required on a case specific critical components inventory. This led to a major chunk of financial reserves availability to handle such situations [18,19]. The interchangeable modular ERS structure could be easily transported to even difficult locations and can be reused in future exigencies.…”
Section: Generalmentioning
confidence: 99%