2022
DOI: 10.29122/jtl.v23i1.5023
|View full text |Cite
|
Sign up to set email alerts
|

Treatment of Mixer Truck Wash Water of a Ready-mix Concrete Batching Plant Using a Low Cost Modified Sand Filter

Abstract: ABSTRAK Pembangunan infrastruktur dan perumahan membutuhkan beton dalam jumlah besar, yang sebagian dipasok oleh pabrik beton siap pakai. Tingginya kebutuhan air dan produksi air limbah oleh industri ini menyebabkan masalah lingkungan yang signifikan. Sebuah pabrik beton di Bali mengolah air limbahnya dengan lima kolam sedimentasi sederhana yang dilengkapi dengan saringan ijuk antar kolam dan kemudian air hasil olahan dibuang ke hutan bakau di sekitarnya. Meskipun nilai Chemical Oxygen Demand (COD) telah ditur… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

1
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 31 publications
1
1
0
Order By: Relevance
“…The concentra- tions were far below the standard. Accordingly, other studies related to washed concrete wastewater also measured the concentration of heavy metals such as cadmium, mercury, copper, zinc, chromium, and lead in the wastewater (Ciawi et al, 2022;Mohamed et al, 2015b;Vaičiukynienė et al, 2021). With the exception of chromium and lead, the concentration of most heavy metals from the aforementioned studies was also low, which is similar to the obtained result of this study.…”
Section: Discussionsupporting
confidence: 87%
See 1 more Smart Citation
“…The concentra- tions were far below the standard. Accordingly, other studies related to washed concrete wastewater also measured the concentration of heavy metals such as cadmium, mercury, copper, zinc, chromium, and lead in the wastewater (Ciawi et al, 2022;Mohamed et al, 2015b;Vaičiukynienė et al, 2021). With the exception of chromium and lead, the concentration of most heavy metals from the aforementioned studies was also low, which is similar to the obtained result of this study.…”
Section: Discussionsupporting
confidence: 87%
“…The treatment of concrete wash wastewater has three main objectives which are to neutralize pH, decrease turbidity, and eliminate pathogens (De Paula et al, 2014). Several treatment methods have been developed and implemented to carry out this treatment process, including the use of sedimentation tanks and the addition of HCl to reduce pH level (Tsimas and Zervaki, 2011), coagulation and aluminium sulphate addition for pH level reduction (De Paula et al, 2014, slow sand filter (Ciawi et al, 2022;Ghrair et al, 2020a), as well as barium chloride and disodium hydrogen phosphate treatment (Mohamed et al, 2015a). These treatment methods can be classified into three groups namely sedimentation, chemical addition, and filtration.…”
Section: Introductionmentioning
confidence: 99%