Day 1 Mon, November 09, 2020 2020
DOI: 10.2118/203103-ms
|View full text |Cite
|
Sign up to set email alerts
|

Tubing Straddle System to Restores Oil Production Using Digital Slickline Conveyance A Case Study

Abstract: The mature Great Burgan field comprises of more than 2000 wells to date, many of these wells utilize artificial lift in their production to maintain production targets. Tubing leaks and integrity issues pose major challenge to the artificial lift pump; these leaks eventually cause pumps temperatures to exceed the operating limit, trip and stop production. The waiting time for a workover rig is about 4 months, this converts to a significant loss of oil production in every well with tubing integri… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 4 publications
0
0
0
Order By: Relevance