“…In the majority of the works, the main objective is to reduce the overall time to perform the deliveries and to improve the quality of service at the same time. Only few works, considering a mixed fleet, analyze the benefits in terms of costs (see [5,8,10,31,42,45,54]) and the limited capacity of trucks (see [5,8,10,31,42,45,53,54]). However, the majority of the works do not consider time window constraints.…”