2018
DOI: 10.1155/2018/6982631
|View full text |Cite
|
Sign up to set email alerts
|

Two-Stage Assembly Scheduling with Batch Setup Times, Time-Dependent Deterioration, and Preventive Maintenance Activities Using Meta-Heuristic Algorithms

Abstract: This article considers a two-stage assembly scheduling problem (TSASP) with batch setup times, time-dependent deterioration, and preventive maintenance activities (PMAs). The objective of this problem is to simultaneously determine the optimal component-manufacturing sequence (CMS), product-assembly sequence (PAS), number of setups, and number and position of PMAs (PPMA). First, to determine the optimal solution, a novel mixed integer linear programming model (MILP) for the proposed problem is derived. Then, a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
6
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(6 citation statements)
references
References 28 publications
0
6
0
Order By: Relevance
“…The studies by Yang et al (2008) , Lee & Kim (2017) , Cui, Lu, Zhou, & Han (2016 , Xing, Qiao, & Lu (2019) , Feng, Tan, Xia, Pan, & Xi (2019 , Yu & Seif (2016) and Jung, Woo, Koh, & Kim (2018) consider scheduling maintenance before reaching a certain machine age. In Yang et al (2008) , maintenance is performed before reaching a limit on the consecutive number of produced jobs.…”
Section: Scheduling Before Reaching Machine Agementioning
confidence: 99%
See 4 more Smart Citations
“…The studies by Yang et al (2008) , Lee & Kim (2017) , Cui, Lu, Zhou, & Han (2016 , Xing, Qiao, & Lu (2019) , Feng, Tan, Xia, Pan, & Xi (2019 , Yu & Seif (2016) and Jung, Woo, Koh, & Kim (2018) consider scheduling maintenance before reaching a certain machine age. In Yang et al (2008) , maintenance is performed before reaching a limit on the consecutive number of produced jobs.…”
Section: Scheduling Before Reaching Machine Agementioning
confidence: 99%
“…In such case, maintenance can be started at any time unless the cumulative working time after the end of the previous maintenance exceeds a certain limit. The studies by Yu & Seif (2016) and Jung et al (2018) examine a maintenance problem where each job deteriorates the machine at a different rate. Yu & Seif (2016) consider multiple ML which are reached through the deterioration of the jobs.…”
Section: Scheduling Before Reaching Machine Agementioning
confidence: 99%
See 3 more Smart Citations