2022
DOI: 10.1016/j.matcom.2021.10.015
|View full text |Cite
|
Sign up to set email alerts
|

Two-tier search space optimisation technique for tuning of explicit plant-model mismatch in model predictive controller for industrial cement kiln process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 47 publications
0
1
0
Order By: Relevance
“…Teja et al [148] presented a work on the control and optimization of a three-string cement rotary kiln using a predictive control model (PCM), with which they claimed that the PCM better handles disturbances, resulting in improved productivity, a reduction in energy consumption and the highest quality of finished product. Ramasamy et al [149] proposed a work to determine the optimal PMM (Plant-Model Mismatch) parameters capable of improving PCM performance under various cement kiln operating scenarios. Stadler et al [150] developed a predictive control model of a cement rotary kiln in the aim of controlling and optimizing clinker combustion in the cement production process.…”
Section: Energy Optimization (Recovery Storage and Recovery Of Waste ...mentioning
confidence: 99%
“…Teja et al [148] presented a work on the control and optimization of a three-string cement rotary kiln using a predictive control model (PCM), with which they claimed that the PCM better handles disturbances, resulting in improved productivity, a reduction in energy consumption and the highest quality of finished product. Ramasamy et al [149] proposed a work to determine the optimal PMM (Plant-Model Mismatch) parameters capable of improving PCM performance under various cement kiln operating scenarios. Stadler et al [150] developed a predictive control model of a cement rotary kiln in the aim of controlling and optimizing clinker combustion in the cement production process.…”
Section: Energy Optimization (Recovery Storage and Recovery Of Waste ...mentioning
confidence: 99%