“…Within the proposed algorithm, in its next section, the inventory items of the group intended (suitable) for the random procurement method, created in the previous section of the algorithm (calculations based on the model EOQ) on the basis of assessment of the particular suppliers delivery times appropriateness, are divided into two groups [1], [7], [12][13][14]: -inventory items group suitable for random method of inventory procurement -satisfactory delivery time of the specific inventory item particular supplier for the random method of procurement (since, the random method of procurement is carried out after the generating the material need, shorter delivery times are more appropriate), -inventory items group suitable for procurement into the inventory -unsatisfactory delivery time of the specific inventory item particular supplier for the random method of procurement. Within the section of the algorithm, where calculations are performed based on the EOQ model, when using the continuous analysis of the items supplier of such inventory group which is intended for the synchronous procurement method, the inventory items are divided into two groups [1], [7], [12][13][14]: -inventory items group suitable for synchronous procurement method. -inventory items group suitable for procurement into the inventory.…”