2005
DOI: 10.1007/bf03054045
|View full text |Cite
|
Sign up to set email alerts
|

UMTS radio network planning — maximizing return on investment

Abstract: This article describes, based on the fundamentals of GSM radio network planning, the process of planning and optimizing UMTS networks. It highlights the key differences to existing 2G technologies and explains why UMTS radio network optimization is so complex that it cannot be done manually any more. This article gives some examples of cost efficient UMTS radio network enhancements in order to maximize future network capacities. It explains how UMTS return on investment is influenced by using advanced methods … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2006
2006
2013
2013

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 3 publications
0
5
0
Order By: Relevance
“…Britvic (2004) specifies the strategic steps to plan and deploy the UMTS radio network, the core network, and the access transport network. Previous studies have provided many solutions to plan, dimen-sion, and deploy the UMTS radio networks (Harmatos et al, 1999;Wu et al, 2003Wu et al, , 2005Jamaa et al, 2004;Maple et al, 2004;Juttner et al, 2005;Neubauer et al, 2005). Different models and methods have been developed to find the optimal topology of the cells if the basic traffic models and location information to install base stations can be provided by mobile operators.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Britvic (2004) specifies the strategic steps to plan and deploy the UMTS radio network, the core network, and the access transport network. Previous studies have provided many solutions to plan, dimen-sion, and deploy the UMTS radio networks (Harmatos et al, 1999;Wu et al, 2003Wu et al, , 2005Jamaa et al, 2004;Maple et al, 2004;Juttner et al, 2005;Neubauer et al, 2005). Different models and methods have been developed to find the optimal topology of the cells if the basic traffic models and location information to install base stations can be provided by mobile operators.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Once we are satisfied with the coverage, the next step is to allocate different channels (frequencies) to the BSs in order to minimize interference in the network while being able to reuse the frequencies in other parts of the network. A first paper by Neubauer and Toeltsch [18] and a second by Ramzi [19] outline the main differences at the radio level between GSM and UMTS networks. They also explain the different steps in order to plan the radio portion (also called radio access network-RAN) of UMTS networks.…”
Section: Cell/base Station Planningmentioning
confidence: 99%
“…With reference to the GPRS=EDGE section, monitoring on the Gb links (Ricciato, Vacirca, Karner, 2005)) can be measured for each cell, and these data used to pinpoint the need for capacity increase in those areas yielding recurrent signs of poor performance. Such novel approach is still in the exploratory phase, but early preliminary results are promising (Ricciato et al, 2006a) about the applicability of such data to complement the current practice of radio network optimization and capacity enhancement (Neubauer, Toeltsch, 2005).…”
Section: Detecting Congestion In the Radio Access Networkmentioning
confidence: 99%