Decision Making Applications in Modern Power Systems 2020
DOI: 10.1016/b978-0-12-816445-7.00002-5
|View full text |Cite
|
Sign up to set email alerts
|

Uncertainty management in decision-making in power system operation

Abstract: I. AbstractDue to the penetration of renewable energy resources and load deviation, uncertainty handling is one of the main challenges for the power system. Therefore, the need for accurate decision making in a power system under the penetration of uncertainties is essential. However, decision-makers should use suitable methods for uncertainty management. In this chapter, some of uncertainty modeling methods in power system studies are analyzed. At first, multiple uncertain parameters which the power system de… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
14
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7

Relationship

3
4

Authors

Journals

citations
Cited by 21 publications
(15 citation statements)
references
References 44 publications
1
14
0
Order By: Relevance
“…It should be noted that Weibull and Normal distribution function are used to model the wind power, load, and price uncertainties. More information can be found in [63,64]. This paper presumes that 10% of the total local demand contributes to DRP as in [65,66].…”
Section: Simulation and Numerical Resultsmentioning
confidence: 99%
“…It should be noted that Weibull and Normal distribution function are used to model the wind power, load, and price uncertainties. More information can be found in [63,64]. This paper presumes that 10% of the total local demand contributes to DRP as in [65,66].…”
Section: Simulation and Numerical Resultsmentioning
confidence: 99%
“…• The uncertainty of wind power generation should be taken into account to avoid financial and technical risks [45].…”
Section: Resultsmentioning
confidence: 99%
“…Meanwhile, the penetration of renewable power generation, and load variation, is one of the most common challenges faced by MGs operation [31]. In [32], a probabilistic optimization approach was investigated for optimal operation of CHP-based MGs integrated with DRP, with the load, energy price, and wind power output uncertainty.…”
Section: Literature Reviewmentioning
confidence: 99%
“…As it is not possible to discharge to the CAES, it operates in the simple cycle mode to generate electricity as a micro-turbine. The restrictions of the CAES scheme are given in ( 24) - (31). The logical constraint that separates the CAES operation mode at each time is represented by (24).…”
Section: Caes Constraintsmentioning
confidence: 99%