SPE Asia Pacific Oil and Gas Conference and Exhibition 2008
DOI: 10.2118/115270-ms
|View full text |Cite
|
Sign up to set email alerts
|

Unique Solution for Fracture Isolation Resolves Water/Gas Breakthrough Challenges in a Horizontal SlimHole Well

Abstract: Preventing water or gas breakthrough and equalizing flow is one of the primary challenges of producing from horizontal slimhole wells. This paper will present a "first-of-its-kind" concept in which swellable packers were used to isolate a waterproducing fracture to prevent/delay water/gas breakthrough and equalize flow across a 3-7/8-in. horizontal open hole. The water-producing fracture was encountered during drilling of the slimhole horizontal in a naturally fractured carbonate reservoir. Prior to the introd… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…When wells are worked over, they are drilled as sidetracks with smaller bit sizes, and consequently, smaller-diameter completion equipment is needed. There has been a limited availability of packer and ICD sizes until now (Al-Mumen et al, 2008).…”
Section: Introductionmentioning
confidence: 99%
“…When wells are worked over, they are drilled as sidetracks with smaller bit sizes, and consequently, smaller-diameter completion equipment is needed. There has been a limited availability of packer and ICD sizes until now (Al-Mumen et al, 2008).…”
Section: Introductionmentioning
confidence: 99%