2022
DOI: 10.3390/a15110433
|View full text |Cite
|
Sign up to set email alerts
|

Unrelated Parallel Machine Scheduling with Job and Machine Acceptance and Renewable Resource Allocation

Abstract: In this paper, an unrelated parallel machine scheduling problem with job (product) and machine acceptance and renewable resource constraints was considered. The main idea of this research was to establish a production facility without (or with minimum) investment in machinery, equipment, and location. This problem can be applied to many real problems. The objective was to maximize the net profit; that is, the total revenue minus the total cost, including fixed costs of jobs, job transportation costs, renting c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 34 publications
0
1
0
Order By: Relevance
“…Distinct values of 𝜎 signify the inherent variability in RES generation, mirroring the practical situation in which the RES is markedly influenced by weather conditions, such as sunlight or wind intensity. Lastly, 𝑇 𝑇 and 𝑇 𝐹 values are defined in (31) and (32) to measure the effect of considering uncertainty under tight and flexible due dates, respectively.…”
Section: A Test Problemsmentioning
confidence: 99%
“…Distinct values of 𝜎 signify the inherent variability in RES generation, mirroring the practical situation in which the RES is markedly influenced by weather conditions, such as sunlight or wind intensity. Lastly, 𝑇 𝑇 and 𝑇 𝐹 values are defined in (31) and (32) to measure the effect of considering uncertainty under tight and flexible due dates, respectively.…”
Section: A Test Problemsmentioning
confidence: 99%