Unsupported advance length in tunnels constructed using New Austrian Tunnelling Method and ground surface settlement

Abstract: SUMMARY Tunnels constructed using New Austrian Tunnelling Method (NATM) are always based on certain round (unsupported) advance lengths, after which, the temporary lining is placed. The settlement of the ground surface resulting from such construction is of high significance in design and practice. The existing data in this respect, however, is scarce. It is the aim of this paper to propose a semi‐analytical procedure based on three‐dimensional finite element analyses to predict the maximum surface settlement … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 20 publications
0
0
0
Order By: Relevance