Upgrading layout and design solutions in the course of design and construction of the Chirkeiskaya hydroelectric plant

Abstract: The author describes innovation engineering solutions used in the construction and assembly works of a hydroelectric power plant, which reduce labor consumption and construction time.The Chirkeiskaya hydroelectric power plant (HPP), which is the largest in the Northern Caucusus with an installed capacity of 1000 MW and an arch dam 232.5 m high, has a long history.The Sulak River on which this HPP is located is the largest waterway in mountainous Daghestan. Its total power potential including its tributaries is… Show more