2022
DOI: 10.30736/cvl.v7i2.882
|View full text |Cite
|
Sign up to set email alerts
|

Upper Structure of Precast Concretes Comparison: PC-I and PC-U in West Outer Ring Road, Surabaya

Abstract: Increasing of motorcycle numbers in big cities in Indonesia, especially in Surabaya. The traffic becomes crowded and road capacity is exceeded. Because of the increasing of motorcycle volume, especially in western part of Surabaya, the government built a flyover in west outer ring road to provide solution to congestion in Surabaya. This study aimed to determine the comparation between PC-I girder and PC-U girder used. In west outer ring road, the method was used to calculate prestressed beam was fully prestres… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…The development of West Outer Ring Road, abbreviated as JLLB, is one of the government's efforts to improve the quality of infrastructure in the City of Surabaya [7] [8]. An imbalance between the length and width of access roads in Surabaya with the number of vehicles causes it.…”
Section: Introductionmentioning
confidence: 99%
“…The development of West Outer Ring Road, abbreviated as JLLB, is one of the government's efforts to improve the quality of infrastructure in the City of Surabaya [7] [8]. An imbalance between the length and width of access roads in Surabaya with the number of vehicles causes it.…”
Section: Introductionmentioning
confidence: 99%