2017 International Carnahan Conference on Security Technology (ICCST) 2017
DOI: 10.1109/ccst.2017.8167811
|View full text |Cite
|
Sign up to set email alerts
|

Use case of waterwork physical protection system robustness evaluation as a part of Slovak critical infrastructure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 17 publications
(17 citation statements)
references
References 3 publications
0
17
0
Order By: Relevance
“…Indeed, this type of testing can also be used for designing the critical infrastructure elements in different types of alarm systems. In addition to critical infrastructure, the results of experimental tests can be used to ensure the continuity of road traffic, particularly in the case of video surveillance systems testing against extreme weather conditions [13][14].…”
Section: Discussionmentioning
confidence: 99%
“…Indeed, this type of testing can also be used for designing the critical infrastructure elements in different types of alarm systems. In addition to critical infrastructure, the results of experimental tests can be used to ensure the continuity of road traffic, particularly in the case of video surveillance systems testing against extreme weather conditions [13][14].…”
Section: Discussionmentioning
confidence: 99%
“…More precisely, assigning values to each indicator will be done using an expert evaluation based on data and results obtained from methods used for data acquisition. The methodology was elaborated on the basis of large literature research (Brickson 2007;Buganova et al 2014;Eames and Moffett 1999;Fraser and Henry 2007;Hesarzadeh and Bazrafshan 2018;Holla et al 2010;Karjalainen et al 2020;Kubas et al 2017;Kurc and Oktay 2018;Lewis et al 2015;Lovecek and Ristvej 2010;Lovecek et al 2017;Ristvej et al 2013;Rehak et al 2018;Siser et al 2017;Siponen et al 2014;Vance et al 2012;Wirtz et al 2016). Besides that, methodology contains a precise definition of questions set up by the interviews and the questionnaire survey, which should be focused on when assigning values to individual indicators.…”
Section: Evaluating the Security And Safety Culture Indicatorsmentioning
confidence: 99%
“…These parameters cause the front lobe to have the highest radiation efficiency and the radiation is significantly suppressed behind or below the antenna. Sector antennas have a relatively high gain of 15-20 dB Loveček et al, 2017).…”
Section: Base Stationmentioning
confidence: 99%