2015
DOI: 10.3846/13923730.2013.802730
|View full text |Cite
|
Sign up to set email alerts
|

Use of Bim Approach to Enhance Construction Interface Management: A Case Study

Abstract: Many interface events and problems occur during the construction phase of construction projects, such that tracking and controlling these are essential to construction management. Interface management (IM) has become the most important aspect of a sound project management strategy. IM affects project cost, scheduling, and quality both directly and indirectly in construction projects. Interface or changed events can be identified and tracked using IM, such that construction processes can be improved, while mini… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
18
0
2

Year Published

2016
2016
2024
2024

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 32 publications
(20 citation statements)
references
References 55 publications
0
18
0
2
Order By: Relevance
“…The use of BIM can also reduce the interface problems. Lin (2015) recommended the use of BIM to enhance construction interface management. Elmualim and Gilder (2014) recommended the use of BIM to improve design management and the collaboration between the various team members.…”
Section: Discussionmentioning
confidence: 99%
“…The use of BIM can also reduce the interface problems. Lin (2015) recommended the use of BIM to enhance construction interface management. Elmualim and Gilder (2014) recommended the use of BIM to improve design management and the collaboration between the various team members.…”
Section: Discussionmentioning
confidence: 99%
“…ere are some research studies focusing on case studies for construction practical interface management [10,[13][14][15][16][17]. ere are some construction interface management research studies focusing on information system developments [5,11,[18][19][20][21]. e above research studies focus mostly on the interface management approaches and internet-based interface management system developments in construction.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Chen and Luo explored and discussed the advantages of 4D BIM for a quality application based on construction codes integrated with product, organization, and process (POP) data definition structure [27]. Lin applied BIM concepts and approaches to enhance the construction interface management implementation [21]. Han and Golparvar-Fard leveraged 4D BIM and 3D point cloud for monitoring construction progress deviations at the operational level [28].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In 2015, Trebbe et al provided practical evidence for the advantages of 4D CAD model application within the construction process based on a case study of a major railway station renovation project in the Netherlands (Trebbe et al, 2015). In 2015, Lin proposed a web-controlled Construction BIM-based Interface Management (ConBIM-IM) system, which is capable of aiding engineers in improving interface information sharing and efficiency tracking in construction projects (Lin, 2015). In 2017, Angel et al presented a modification of IDM (Information Delivery Manual) methodology and LOD approach of risk assessment of BIM adoption (Lu et al, 2015).…”
Section: Literature Reviewmentioning
confidence: 99%