2016
DOI: 10.1016/j.egypro.2015.12.346
|View full text |Cite
|
Sign up to set email alerts
|

Use of Parallel Processing in Applications for Hydro Power Scheduling – Current Status and Future Challenges

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2025
2025

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…The startup cost has become a discrete function, due to the discretization of the time span into hourly periods (the black dots). The discrete start-up cost can be approximated by a stair-wise function as described in (27)- (28). The linearization mechanism for stair-wise start-up cost and step-wise shut-down costs, which depends only on the binary variables, corresponds to the on/off state of generating units, (27)- (30).…”
Section: Linearized Start-up and Shut-down Costsmentioning
confidence: 99%
See 1 more Smart Citation
“…The startup cost has become a discrete function, due to the discretization of the time span into hourly periods (the black dots). The discrete start-up cost can be approximated by a stair-wise function as described in (27)- (28). The linearization mechanism for stair-wise start-up cost and step-wise shut-down costs, which depends only on the binary variables, corresponds to the on/off state of generating units, (27)- (30).…”
Section: Linearized Start-up and Shut-down Costsmentioning
confidence: 99%
“…It is carried by sharing process resources concurrently across multiple processors at different stages of execution [27]. Parallel processing was used in hydro power scheduling [28], and microgrid power management system [29]. In addition, multithreading was applied successfully in unit commitment [25] and variable wind generation scheduling [30].…”
Section: Multithreadingmentioning
confidence: 99%