2020
DOI: 10.1016/j.cscm.2020.e00437
|View full text |Cite
|
Sign up to set email alerts
|

Use of reinforced ceramics for slabs in an autarchy period. Pathology and intervention strategies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…In the study by Serrano-Lanzarote et al [11], the repair costs obtained for existing systems of this type of joist were approximately 125 EUR/m 2 , reaching 165 EUR/m 2 if it was necessary to increase the element's resistance, with no additional fire protection.…”
Section: Protection Against Corrosion and Maintenance Costsmentioning
confidence: 96%
See 2 more Smart Citations
“…In the study by Serrano-Lanzarote et al [11], the repair costs obtained for existing systems of this type of joist were approximately 125 EUR/m 2 , reaching 165 EUR/m 2 if it was necessary to increase the element's resistance, with no additional fire protection.…”
Section: Protection Against Corrosion and Maintenance Costsmentioning
confidence: 96%
“…The main aim of the present study was to investigate the on-site repair of ceramic violin joists [8,9], a field that expanded greatly in the 1940s, 1950s and 1960s on the Mediterranean coast [10], and is without any doubt one of the biggest current challenges in the repair of existing buildings [11]. This type of system [12] was widely used in the post-civil war period in Spain [2,13] in response to the great need for housing combined with real shortages of steel and cement [10].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation