Proceedings of SPE Annual Technical Conference and Exhibition 2005
DOI: 10.2523/96773-ms
|View full text |Cite
|
Sign up to set email alerts
|

Valhall Field: Microfracture Acquisition Using Wireline-Formation-Tester Tools To Validate Fracture Confinement

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0
1

Year Published

2006
2006
2007
2007

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 0 publications
0
2
0
1
Order By: Relevance
“…Within six months, chalk influx, lost productivity, and liner deformations were severe and caused lost access to most of the horizontal sections. 32 As of 2005, over 200 propped fracs have been performed from horizontal wells in the field 33 , and current completion design has evolved to aggressive (TSO) designs with increasing proppant diameter and curable resin coatings to minimize proppant flowback. New horizontal wells were stimulated with 16/20 LWC and aggressive TSO designs, resulting in twice the productivity and 150% the cash flow of conventional wells.…”
Section: Comparison To Other Published Resultsmentioning
confidence: 99%
“…Within six months, chalk influx, lost productivity, and liner deformations were severe and caused lost access to most of the horizontal sections. 32 As of 2005, over 200 propped fracs have been performed from horizontal wells in the field 33 , and current completion design has evolved to aggressive (TSO) designs with increasing proppant diameter and curable resin coatings to minimize proppant flowback. New horizontal wells were stimulated with 16/20 LWC and aggressive TSO designs, resulting in twice the productivity and 150% the cash flow of conventional wells.…”
Section: Comparison To Other Published Resultsmentioning
confidence: 99%
“…Besides monitoring parameters such as rates, volumes, pressures, proppant loading and chemical concentrations some of them both on the surface and downhole, engineers now have resources such as tiltmeters, microseismic and various wirelines tools [48][49][50][51] .…”
Section: Key Aspects For Designing and Implementing Horizontal Complementioning
confidence: 99%
“…)На Рисунок 20 показан профиль добычи для одного из интервалов месторождения Купарук. По данным 2005 года на этом месторождении было проведено свыше 200 ГРП 33 ,. Повторный ГРП был проведен на более чем 185 из 380 скважин к началу 1991.…”
unclassified