2007 7th Internatonal Conference on Power Electronics 2007
DOI: 10.1109/icpe.2007.4692400
|View full text |Cite
|
Sign up to set email alerts
|

Validation of electrical power system using Electrical Test Bed of GEO satellite

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2007
2007
2022
2022

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Experimental measurement was done on the electrical test bed (ETB) platform to confirm the validity of the proposed model. The ETB is composed of engineering model (EM) units of the spacecraft and provides a test environment, which is required for acceptance tests at the system level, prior to flight model (FM) testing [13]. It is used to verify the electrical interface between each subsystem and the system-level functions, including the flight software.…”
Section: Experimental Verificationmentioning
confidence: 99%
“…Experimental measurement was done on the electrical test bed (ETB) platform to confirm the validity of the proposed model. The ETB is composed of engineering model (EM) units of the spacecraft and provides a test environment, which is required for acceptance tests at the system level, prior to flight model (FM) testing [13]. It is used to verify the electrical interface between each subsystem and the system-level functions, including the flight software.…”
Section: Experimental Verificationmentioning
confidence: 99%