Variation Mitigation Model to Enhance Construction Performance of Public Building Projects in Tanzania

Abstract: Detrimental variations are variations which negatively impact the project performance resulting into scenarios such as cost overruns, time overruns, project abandonment, rework, disruption and conflicts. These scenarios have led to non-fulfillment of project objectives. The objective of the study was to develop a mitigation model that helps to mitigate detrimental variations in public building projects in Tanzania. Specifically, the research question was how can detrimental variations be minimised in building … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 20 publications
0
2
0
Order By: Relevance
“…The study adopted a descriptive research design. The study used descriptive research design because it explains situations that are already known and have data available (Mbelwa, 2015). The research investigated the effects of project management practices on the Mnazi bay gas project performance.…”
Section: Methodology Study Designmentioning
confidence: 99%
“…The study adopted a descriptive research design. The study used descriptive research design because it explains situations that are already known and have data available (Mbelwa, 2015). The research investigated the effects of project management practices on the Mnazi bay gas project performance.…”
Section: Methodology Study Designmentioning
confidence: 99%
“…Furthermore, Desai et al (2015) believed that the change orders in construction projects increase the cost between 10% to 15% of the contract value and reduce productivity from 10% to 20%. While Mhando et al (2018) reported that the increase in construction cost due to change orders in Tanzania ranged between 6%–10% of the original contract cost.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Consequently, these have led to non-fulfillment of project objectives. Tanzania being a developing country has problems related to detrimental effects of variations in developing its public building projects [1]. In the context of Tanzania construction sector, it is observed that, instead of a project taking two years it takes more than three years with its cost doubling [2].…”
Section: Introductionmentioning
confidence: 99%