2022
DOI: 10.55463/issn.1674-2974.49.8.23
|View full text |Cite
|
Sign up to set email alerts
|

Verification of a Synthetic Rainfall Model Based on the ArRR and Satellite Rainfall

Abstract: Synthetic rainfall is needed as an input in the analysis of design flood. This research intends to conduct the verification of a synthetic rainfall model based on the ArRR and satellite result. The rainfall data is as the main component in obtaining the design, detail design, operation and maintenance of effective water resource infrastructure. Rainfall data is often used for the analysis of flood balance, flood frequency distribution, estimation of river discharge, and design of water structure. However, the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The canal network in the work area of block-C ex PLG is wide enough and long not only to dry the available peatland. However, it also tends to become the origin of fire [5], which is not on purpose, as well as the fire as the reason for area cleaning activity. Therefore, canal closing is also hoped to limit the number of persons who enter the peatland area and decrease the risk of fire.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The canal network in the work area of block-C ex PLG is wide enough and long not only to dry the available peatland. However, it also tends to become the origin of fire [5], which is not on purpose, as well as the fire as the reason for area cleaning activity. Therefore, canal closing is also hoped to limit the number of persons who enter the peatland area and decrease the risk of fire.…”
Section: Introductionmentioning
confidence: 99%
“…The above shows that the main and biggest challenge to avoid the repetition of peatland fire and smog is to keep the peatland from risk during the dry season [5], [6]. Therefore, accurate and fast action in the prevention and management of disasters, remembering that canal blocking is useful in increasing the water level depth of an area [7] and works to maintain the decline speed of extreme water surface [8] during the dry season and fire-prone.…”
Section: Introductionmentioning
confidence: 99%