2015 North American Power Symposium (NAPS) 2015
DOI: 10.1109/naps.2015.7335245
|View full text |Cite
|
Sign up to set email alerts
|

Voltage stability index for online voltage stability assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(7 citation statements)
references
References 21 publications
0
6
0
1
Order By: Relevance
“…The simulated result validates VCPI_1 dominance and variation as plotted in Figure 5b on the secondary axis. Moreover, this work put efforts to study with CLNA in multiple real and reactive load changes at the different load bus, compare with other VSIs which is a novel contribution of this work not discussed in the studies [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][21][22][23]. 4.3.3 System with CLNA in maximum real and reactive load change and SLG fault at different line Figure 5c represents the variation of VSIs magnitude for a different line.…”
Section: System With Clnamentioning
confidence: 99%
See 1 more Smart Citation
“…The simulated result validates VCPI_1 dominance and variation as plotted in Figure 5b on the secondary axis. Moreover, this work put efforts to study with CLNA in multiple real and reactive load changes at the different load bus, compare with other VSIs which is a novel contribution of this work not discussed in the studies [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][21][22][23]. 4.3.3 System with CLNA in maximum real and reactive load change and SLG fault at different line Figure 5c represents the variation of VSIs magnitude for a different line.…”
Section: System With Clnamentioning
confidence: 99%
“…A VSI based on maximum loading capability of the bus combined with Thevenin equivalent method which requires PMU data is further discussed in Maharjan and Kamalasadan [12]. Thevenin equivalent method requires PMU data which is large so computational time is more.…”
Section: Introductionmentioning
confidence: 99%
“…Most often performed with an external control. The duration of the stroke is determined by the duration of the external control pulse of a rectangular shape [9]. If necessary, you can create generators running in sync mode or the oscillatory modex [10].…”
Section: The Calculation Diagram Of the Sawtooth Generatormentioning
confidence: 99%
“…Modern power systems are more vulnerable to instabilities as a result of operational proximity with their loadability limits [1–3]. Factors such as heavy loading conditions, uncertainties from renewable generation, load recovery dynamics, and different types of contingencies like line tripping or generator outages have made the secure operation of a grid challenging task [4–6]. In both planning and operational stages, network security is associated with voltage stability, which relates to the ability of the power system to maintain steady‐voltage levels at all buses after being subjected to a disturbance [7–9].…”
Section: Introductionmentioning
confidence: 99%