VU limit pre‐assessment for high‐speed railway considering a grid connection scheme

Abstract: Single-phase 25-kV AC traction power supply systems (TPSSs) are widely used in high-speed railways (HSRs), leading to an increasingly prominent problem of voltage unbalance (VU) in the power grid. To fairly regulate the system VU level, implementing VU limit pre-assessment is an urgent need. A grid connection scheme, including traction transformer selection and exchange phase connection (EPC) design, is a vital part of TPSS design that obviously affects the voltage unbalance factor (VUF) of power systems. A un… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 19 publications
(6 citation statements)
references
References 31 publications
0
6
0
Order By: Relevance
“…κ U is the voltage unbalance upper limit specified in the power quality standard. The derivation of negative sequence current is as follows 33 :…”
Section: Constraint Functions: Voltage Unbalancementioning
confidence: 99%
“…κ U is the voltage unbalance upper limit specified in the power quality standard. The derivation of negative sequence current is as follows 33 :…”
Section: Constraint Functions: Voltage Unbalancementioning
confidence: 99%
“…It is assumed that the traction power is set as P L , the powers through the TT and α phase converter of the PFC are set as P T and P α , respectively, and the allowable three-phase unbalance factor u θ and system short-circuit capacity S d are known. According to (2) and (3), the power through the TT should satisfy:…”
Section: Derivation Of the Switching Threshold 331 Threshold Of Thementioning
confidence: 99%
“…On the other hand, the high-speed electric multiple units (EMUs) have been widely applied in China's high-speed railway (HSR), which possess the high power factor (PF) and huge traction power. For example, the traction power of CRH380AL has arrived at 20 MW, and the PF is closed to 1 [2,3]). As a result, a large negative sequence (NS) current will be injected into the threephase system, arouses severe challenges for the economy and reliability of TPSS.…”
Section: Introductionmentioning
confidence: 99%
“…The adoption of STATCOM solutions to mitigate these issues has been reviewed in [25]. In [26] is presented a three-stage pre-assessment process taking into consideration the grid connection scheme, towards an evaluation for the need of a compensator in the TPSS. In [27] is studied the integration of wind farms and the HSR power system, when both geographically coexist in weak power grids of remote areas.…”
Section: Introductionmentioning
confidence: 99%