2019
DOI: 10.1007/s11629-017-4653-z
|View full text |Cite
|
Sign up to set email alerts
|

Vulnerability assessment of the Satluj catchment for sustainable development of hydroelectric projects in the northwestern Himalaya

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 36 publications
0
6
0
Order By: Relevance
“…The upper valley of River Satluj was highly affected because of landslides incidences. These incidences were common in Himalaya's region but here frequency of these incidences were very high, It was evident from the previous study that maximum landslides incidences were occurred because of its fragile topography and haphazard development of hydroelectric projects [3]. The active landslides (Sudha Rang Dakhu, Shongtong, Urni, Tapari) were noticed in the region because of the slope failure incidences [4].…”
Section: Introductionmentioning
confidence: 93%
See 3 more Smart Citations
“…The upper valley of River Satluj was highly affected because of landslides incidences. These incidences were common in Himalaya's region but here frequency of these incidences were very high, It was evident from the previous study that maximum landslides incidences were occurred because of its fragile topography and haphazard development of hydroelectric projects [3]. The active landslides (Sudha Rang Dakhu, Shongtong, Urni, Tapari) were noticed in the region because of the slope failure incidences [4].…”
Section: Introductionmentioning
confidence: 93%
“…If we reduce the number of hydroelectric projects and develop the minimum equidistance criteria for the upcoming projects, the loss to physical landscape and resentment among the public regarding compensation and others would be minimum. The equidistance strategy can be implement in the River valley to avoid the physical loss the same model we can apply aerial inter distance between the projects where 7 km radius for large hydroelectric project 25 MW, 5 km for medium (5-25 MW) and 3 km should be suggested for small projects in mountain environment [3,7]. Reservoirs / dams and powerhouse sites can be considered for a midpoint of equidistance buffer; however this can be depends on the nature of hydropower projects.…”
Section: Consultation Meetings With the Stakeholdersmentioning
confidence: 99%
See 2 more Smart Citations
“…The young fold mountains of the Himalayas are one of the most active mountainous regions, which makes them particularly vulnerable to landslides which have significant impact on human social sustainability (Kuniyal et al, 2019). The most frequent means of transportation in hilly areas is road transit, which are at risk in the event of a landslide.…”
Section: Introduction Introduction Introduction Introductionmentioning
confidence: 99%