Natural Hazards - Risk Assessment and Vulnerability Reduction 2018
DOI: 10.5772/intechopen.78585
|View full text |Cite
|
Sign up to set email alerts
|

Vulnerability, Urban Design and Resilience Management

Abstract: After 30 years without any serious flooding, and over half a century without any major floods (the river Seine's last "important" flooding in Paris took place in January 1955), the 2016 event questions our capacity to evaluate the flood hazard and its impacts. For the Ile-de-France region, the hazard occurred outside defined periods of vigilance, as a result of heavy rains downstream of the main protection structures formed by reservoirs. For this reason, these large protection works only had a very moderate i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…With the advantages of integrated "planningconstruction-management" urban design in the aspects of energy saving and environmental protection, production cost reduction, acceleration of construction speed, and so on, to fully comply with the standard of the principle "four savings and one environmental protection," it is necessary to carry out proper management and control of the construction quality during the integrated urban construction period. e management and control of construction quality has become a key issue in integrated urban construction [8][9][10]. Hence, in the integrated urban design process of "planning-construction-management," it is required to assess the construction quality of the system in all aspects accordingly.…”
Section: Introductionmentioning
confidence: 99%
“…With the advantages of integrated "planningconstruction-management" urban design in the aspects of energy saving and environmental protection, production cost reduction, acceleration of construction speed, and so on, to fully comply with the standard of the principle "four savings and one environmental protection," it is necessary to carry out proper management and control of the construction quality during the integrated urban construction period. e management and control of construction quality has become a key issue in integrated urban construction [8][9][10]. Hence, in the integrated urban design process of "planning-construction-management," it is required to assess the construction quality of the system in all aspects accordingly.…”
Section: Introductionmentioning
confidence: 99%