All Days 2012
DOI: 10.2118/157027-ms
|View full text |Cite
|
Sign up to set email alerts
|

Well Structure Optimization in Complex Wells for High Permeability Reservoirs

Abstract: The objective of drilling long horizontal wells and maximum number of laterals is to achieve maximum production rate. Reservoir contact of more than 5 km was drilled successfully through intelligent laterals (up to 5 laterals) that can be controlled from the surface. Currently there is a growing tendency of drilling higher number of laterals in the industry to maximize the production rate. The objective of this study is to evaluate the possibility of achieving this growing multilateral completion through two m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?