2019
DOI: 10.1016/j.egypro.2019.01.476
|View full text |Cite
|
Sign up to set email alerts
|

Wind-Solar-Hydro power optimal scheduling model based on multi-objective dragonfly algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 29 publications
(13 citation statements)
references
References 10 publications
0
13
0
Order By: Relevance
“…The number of load requests PR is proportional to all generators' combined capacity, while the transmission line's power losses are ignored [16]. ( 8) A requirement for the optimum distribution from the ith generator of production costs is (9) Where λ is a multiplier of the Lagrange or (10) Determining the value of Pi from the equation above is: (11) The equation above can be iteratively solved. The value of λ is obtained by replacing the value of Pi in equation 7 with equation 8, resulting in the following results: ( 12) or (13) where:…”
Section: F Economical Operation Lambda Iteration Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…The number of load requests PR is proportional to all generators' combined capacity, while the transmission line's power losses are ignored [16]. ( 8) A requirement for the optimum distribution from the ith generator of production costs is (9) Where λ is a multiplier of the Lagrange or (10) Determining the value of Pi from the equation above is: (11) The equation above can be iteratively solved. The value of λ is obtained by replacing the value of Pi in equation 7 with equation 8, resulting in the following results: ( 12) or (13) where:…”
Section: F Economical Operation Lambda Iteration Methodsmentioning
confidence: 99%
“…For the delivery of generator loads, the electric power grid's operation is necessary to achieve optimum function. Coordination of the loading of massive electric power produced by the central power plant units needs to be aligned to obtain cheap fuel consumption costs [11] Economic distribution is one means of calculating the quantity of power generated by each generator unit to fulfill a given load by optimally separating the load on the generating units in the system to rationalize the cost of developing fuel consumption [12].…”
Section: B Power Plants Optimizationmentioning
confidence: 99%
See 1 more Smart Citation
“…All the above motivation factors are then mixed up with different weighting factors to make a united factor as below [27]:…”
Section: Improved Optimization Based On Mdamentioning
confidence: 99%
“…Due to the high complexity of the proposed discrete optimization problem, a new optimization algorithm based on the dragonfly algorithm (DA) is developed to manage the optimal scheduling of the units, loads, storages and switches in the microgrid. DA is a new heuristic optimization algorithm that mimics the fly of some insects and makes a powerful algorithm for solving the hard problems [27]. To enrich its performance, a novel self-adaptive modification method is introduced, which makes it possible for dragonflies to select the solution that best matches their structure.…”
Section: Introductionmentioning
confidence: 99%