Offshore Dubai is a maturing oil province and to access outlying, isolated hydrocarbon reserves it is necessary to expose several unstable sections of troublesome shale during drilling operations. Historically during the drilling of these wells, wellbore time-based instability issues have been experienced in the Aruma and Laffan shales on offset wells with shorter buildup sections. It is therefore necessary to drill these sections as efficiently as possible, minimizing the time these shales are exposed. Dubai Petroleum looked at a combination of new technologies available in the market that could help both to optimize the drilling of these sections and to meet the directional objectives. To control the shales a high-performance water-based mud (HPWBM) system with triple inhibition was proposed to Dubai Petroleum after a series of tests and field experience in the region. To achieve the directional objectives and minimize the time to drill the section, a performance drilling system (rotary steerable tool in combination with a modular motor) and drilling dynamics sub were suggested. The section was drilled safely in a single run with all drilling objectives achieved and breaking all previous 24-hr ROP drilling records for an offshore Dubai Petroleum well. No shale instability issues were experienced, including the longest Aruma shale section ever drilled by Dubai Petroleum. The combination of new technologies and detailed planning applied offshore Dubai for the first time allowed a step change in the Dubai Petroleum offshore drilling and enable previously inaccessible hydrocarbon reserves to be reached and produced. Introduction Geological and geophysical subsurface studies had indicated the potential of isolated, unrecovered hydrocarbon reserves offshore Dubai which could not be accessed by standard sidetrack operation. In the past decade mostly sidetracks of exisiting wells had been drilled to enhance production, prior to the drilling of a horizontal section within the reservoir. Typically a build section was drilled and the well landed in the top of the main carbonate reservoir of the Ilam and Mishrif, with the build section then cased off and a horizontal section then drilled, completed, stimulated and produced. To develop the above-mentioned isolated reserves a cost comparison between a "new drill" versus a "semi-extended reach well" was carried out. This comparison concluded that a semi-extended reach well would be more viable and less costly than a new drill. To meet the given target requirements it was necessary to drill a build section in excess of 6,800-ft (2,073-m) with approximately 4,000 ft (1,219 m) of Aruma shale and 340 ft (104 m) of Laffan shales at 76-degree inclination. Historically during the drilling offset wells, they exhibited time-dependent wellbore instability issues. Dubai Petroleum looked at new technologies available in the market that could be used to help both optimize the drilling of these sections and also to meet the directional objectives. For controlling the shales a high-performance water-based mud (HPWBM) system with triple inhibition was introduced to Dubai Petroleum. To achieve the directional objectives and minimize the time to drill the section, a performance drilling system (rotary steerable tool in combination with a modular motor) and drilling dynamics sub were utilised.
Offshore Dubai is a maturing oil province and to access outlying, isolated hydrocarbon reserves it is necessary to expose several unstable sections of troublesome shale during drilling operations. Historically during the drilling of these wells, wellbore time-based instability issues have been experienced in the Aruma and Laffan shales on offset wells with shorter buildup sections. It is therefore necessary to drill these sections as efficiently as possible, minimizing the time these shales are exposed. Dubai Petroleum looked at a combination of new technologies available in the market that could help both to optimize the drilling of these sections and to meet the directional objectives. To control the shales a high-performance water-based mud (HPWBM) system with triple inhibition was proposed to Dubai Petroleum after a series of tests and field experience in the region. To achieve the directional objectives and minimize the time to drill the section, a performance drilling system (rotary steerable tool in combination with a modular motor) and drilling dynamics sub were suggested. The section was drilled safely in a single run with all drilling objectives achieved and breaking all previous 24-hr ROP drilling records for an offshore Dubai Petroleum well. No shale instability issues were experienced, including the longest Aruma shale section ever drilled by Dubai Petroleum. The combination of new technologies and detailed planning applied offshore Dubai for the first time allowed a step change in the Dubai Petroleum offshore drilling and enable previously inaccessible hydrocarbon reserves to be reached and produced. Introduction Geological and geophysical subsurface studies had indicated the potential of isolated, unrecovered hydrocarbon reserves offshore Dubai which could not be accessed by standard sidetrack operation. In the past decade mostly sidetracks of exisiting wells had been drilled to enhance production, prior to the drilling of a horizontal section within the reservoir. Typically a build section was drilled and the well landed in the top of the main carbonate reservoir of the Ilam and Mishrif, with the build section then cased off and a horizontal section then drilled, completed, stimulated and produced. To develop the above-mentioned isolated reserves a cost comparison between a "new drill" versus a "semi-extended reach well" was carried out. This comparison concluded that a semi-extended reach well would be more viable and less costly than a new drill. To meet the given target requirements it was necessary to drill a build section in excess of 6,800-ft (2,073-m) with approximately 4,000 ft (1,219 m) of Aruma shale and 340 ft (104 m) of Laffan shales at 76-degree inclination. Historically during the drilling offset wells, they exhibited time-dependent wellbore instability issues. Dubai Petroleum looked at new technologies available in the market that could be used to help both optimize the drilling of these sections and also to meet the directional objectives. For controlling the shales a high-performance water-based mud (HPWBM) system with triple inhibition was introduced to Dubai Petroleum. To achieve the directional objectives and minimize the time to drill the section, a performance drilling system (rotary steerable tool in combination with a modular motor) and drilling dynamics sub were utilised.
Extended Reach Drilling (ERD) is an integrated methodology for drilling high-angle wellbores with long horizontal displacements. Several problems are associated with extended reach wells. Thus for high levels of performance improvement to be achieved, it is essential to analyze the interrelationship among the elements involved in the entire drilling process. This is because a system that considers the individual elements of the drilling system in isolation is inadequate to deliver desired performance improvement.In this study, an algorithm that sets forth a design for a drilling program that is suitable to drill an extended reach well was developed using Visual Basic. Although the algorithm touches on several factors affecting extended reach drilling, the major focus is on the six elements, which are considered the critical factors. These are: Well Trajectory Design, Bottom Hole Assembly (BHA) Design, Bit Hydraulics, Drill String Design, Torque and Drag, Hole Cleaning and ECD Management. The proposed algorithm evaluates the interrelationship among these critical factors and provides direction on the processes and tasks required at all stages in the design and drilling of an ERD well to achieve maximum drilling performance. The development of the model is based upon information gathered from several sources, many new ideas from technical publications, along with information and feedback from field-based personnel. The output generated from the model compare well with results from actual field data.
Extended Reach Drilling (ERD) is an integrated methodology for drilling high-angle wellbores with long horizontal displacements. Several problems are associated with extended reach wells. Thus for high levels of performance improvement to be achieved, it is essential to analyze the interrelationship among the elements involved in the entire drilling process. This is because a system that considers the individual elements of the drilling system in isolation is inadequate to deliver desired performance improvement.In this study, an algorithm that sets forth a design for a drilling program that is suitable to drill an extended reach well was developed using Visual Basic. Although the algorithm touches on several factors affecting extended reach drilling, the major focus is on the six elements, which are considered the critical factors. These are: Well Trajectory Design, Bottom Hole Assembly (BHA) Design, Bit Hydraulics, Drill String Design, Torque and Drag, Hole Cleaning and ECD Management. The proposed algorithm evaluates the interrelationship among these critical factors and provides direction on the processes and tasks required at all stages in the design and drilling of an ERD well to achieve maximum drilling performance. The development of the model is based upon information gathered from several sources, many new ideas from technical publications, along with information and feedback from field-based personnel. The output generated from the model compare well with results from actual field data.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.