The contract C310 comprises the construction of the Plumstead and North Woolwich Portals and the twin tube Thames Tunnel, which has a length of approximately 2.6 km between the two portals. The two TBMs used for the construction of the Thames Tunnel will drive through varying ground conditions (Thanet Sand, River Terrace Deposit (gravel), and chalk) below the water table. During the drive under the River Thames, the tunnels will only have an overburden of approximately 12 m. The effect of pressure variation due to the tidal River Thames has to be accounted for in the control of the tunnelling. The tunnel will pass underneath several grade II listed buildings, utilities, adjacent to operational railway tracks and close to existing subway tunnels. Previous experience of the handling and disposal of excavated chalk has been gained on several tunnelling projects in chalk, most notably the Dartford Road Tunnels, the Channel Tunnel, the Brighton Stormwater Tunnel, the Lille Metro Tunnel, the Socatop Road Tunnel near Paris and Channel Tunnel Rail Link CTRL 320. The Contract allowed for both Mixshield and EPB TBM Technology. The advantages and disadvantages of a TBM-S with Earth Pressure Balanced face support (EPB-TBM) and a TBM-S with Slurry Face support (Mix-Shield TBM) for the C310 Thames Tunnels were discussed after contract award and a comparative risk assessment was developed. A Mixshield TBM is more expensive but outperformed the EPB TBM in the overall scoring of risk assessment and therefore it has been decided to use this type at C310.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.