This paper discusses on the introduction of Operational Excellence (OE) implementation during drilling operation. It highlights the culture of continuous learning and communication between all parties prior and during executing a specific operation. This resulted in noticeable improvement throughout the drilling campaign.Operational Excellence (OE) is an initiative that has been introduced to enhance the drilling performance in meeting the goal of drilling to technical limit. It comprises of continuous communication and teamwork between operator and service providers. This process is a continuous circle which begins with preparing the Standing Instruction for Driller (SID) which will then be reviewed during the Drilling Well on Paper (DWOP) session and prior to executing the job. Upon completion of the job, After Action Review (AAR) will be conducted where best practices and improvement would be identified to be captured in the database for the lesson learned which will be incorporated in the next operation.The success of this initiative can be highly reflected by the improvement of the drilling performance throughout the drilling campaign. The first 2 wells (new slot & side-track well) was used as the baseline drilling performance. In these first 2 wells, Invisible Lost Time (ILT), offline activities opportunity, and many performance gaps were identified during the AAR and Lesson Learn (LL) session. These are then incorporated in the SID during the planning and execution of the following wells. The improvements on the performance of the following wells can be perceived by the drilling Key Performance Index (KPI). The Well Costs Per Foot (WCPF) and Drilling Costs Per Foot (DCPF) improved from 10% below budget to 50% below budget on the last well of the campaign. The Drilling Days Per Thousand Feet (DDPTF) has improved from 40% above the allocated days to 20% below the allocated days. These continuous drilling improvement also improved the Non-Productive Time (NPT) from above 10% to below 1% in the last well of the campaign.The successful of the Operational Excellence (OE) implementation during completing this drilling campaign will become the new culture for planning, designing and executing future drilling operation.
This paper discusses on the new method of MWD surveying in drilling operations. It highlights the ability to take surveys faster than the conventional method while minimizing drilling risks. This resulted in a significant time reduction of the overall survey operations. The MWD survey package normally requires the BHA to be stationary before it can start to acquire new survey data. Previous MWD survey systems monitored drilling fluid flow rate to trigger the MWD survey acquisition. This new MWD survey technique monitors rotation, optimising low noise detection, earlier. The new method takes less survey time, the pumps off time removed from the survey period. This new method has been utilized in 4 out of 5 wells throughout the drilling campaign. The benefits can be clearly quantified from the comparison between the conventional and new approach. Based on the Drilling Mechanical Logs, the new method has proven to be able to shorten the surveying time by up to 80% compared to conventional. This translated to approximately 8.7 hours of rig time savings for the drilling phase of the project. Apart from time saving, it reduces stuck pipe risk by not having to stop pumping while also minimizing pipe stationary time. With the simplified survey operations, there is less likelihood of facing survey problems related to pump, signal and any other issues that may lead to the need of repeating survey. Companies operating the exploration and production of oil, gas and water energy resources are continually looking for methods and techniques to reduce the time taken to drill and construct wells. The drilling phase is typically where there is a higher cost due to the drilling rig daily spread cost and the associated added environmental, health and safety risk aspects. Typically wellbore construction process is designed with a specified minimum tolerance for placing the wellbore inside the desired geologic zone or horizon, avoiding offset wellbores and geohazards and surveying the wellbore position sufficiently accurately to enable a relief well to be drill in the event of a well blow out. Wells drilled during the recent five well campaign, offshore Malaysia have utilised this new method for taking surveys with reduced survey time as part of the new operator Operational Excellence and Drilling the Limit initiatives.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.