HighlightsThis study provides data from internal erosion tests on four intermediate-scale homogeneous embankment dams.Soil properties influence the breach formation process and breach timing.Results showed that observed erosion rates of the internal flow path varied by several orders of magnitude.Quality control of embankment construction can greatly influence breach development.Abstract. Internal erosion and embankment overtopping are the two most common causes of embankment dam and levee failures and incidents. Internal erosion is the removal of soil material by the flow of water through a continuous defect, cavity, or crack within a compacted fill and/or its foundation. Internal erosion initiates from vulnerabilities within the embankment. The embankment soil material plays a key role in both the erosion process and rate of failure, but characterizing soil properties and how they relate to the rate of failure can be challenging. Soil properties such as texture, density, strength, moisture content, and erodibility can vary greatly; thus, it is important to study the effects of these properties on the breach formation process and breach timing. The USDA Agricultural Research Service performed internal erosion breach experiments on four intermediate-scale homogeneous earthen embankments constructed of soils ranging from a silty sand to a lean clay material. The embankments were constructed to a height of 1.3 m, a top width of 1.8 m, and upstream and downstream slopes of 3(H):1(V). The embankment materials were characterized by water content, density, texture, strength, and erodibility. Erodibility was measured using a jet erosion test (JET) apparatus. A 40 mm diameter, continuous steel pipe was placed through each embankment during construction and removed to form an open-ended void through the embankment connected to the upstream reservoir. The removal of the pipe initiated internal erosion. The objectives of the experiments were to observe the development of the internal erosion process over time and to examine the influence of soil properties on the erosion rate, breach timing, geometry of the breach opening, and breach outflow. The rate of erosion and failure observed in these tests varied by several orders of magnitude, with the silty sand embankment eroding most rapidly and the lean clay embankment with a mean moisture content of 18% dry basis at standard compaction eroding the slowest. These observations were indicative of the soil textures. Although the two lean clay embankments were constructed of similar soils, the difference in erosion rates speak to the importance of quality control (e.g., compaction moisture content) during construction. Soil properties including soil texture, erodibility, and compaction moisture content are key predictors of erosion rate and observed failure. Keywords: Breach, Dam failure, Dams, Embankments, Erodibility, Internal erosion, Levees, Overtopping.
This paper investigates reduction in degradation downstream of broken-back culverts by forming a hydraulic jump. A model was built in the laboratory focusing on a drop between inlet and outlet of 18 feet. Three flow conditions simulated included 0.8, 1.0 and 1.2 times the culvert depth. The hydraulic jump created in the culvert is classified as an "oscillating jump." To locate the jump near the toe, different sill and friction block arrangements were tested. The length of the culvert was 150 feet. In the broken-back culvert, a slope of 1 (vertical) to 2 (horizontal) was used for ease of construction, with the flat part at a one percent slope. The best option to maximize energy dissipation is to use one 5 foot sill located 43 feet from the outlet. The length of the culvert can be reduced by 40 feet. The calculated energy dissipation of the culvert was 66 percent.
This study addresses two key objectives using operational performance data from most of the Round 1 wind farms connected to the grid in South Africa: benchmarking of wind farm performance and validation of the pre-construction energy yield assessments. These wind farms were found to perform in line with internationally reported levels of wind farm availability, with a mean energy-based availability of 97.8% during the first two years of operation. The pre-construction yield assessments used for financing in 2012 were found to over-predict project yield (P50) by 4.9%. This was consistent with other validation studies for Europe and North America. It was also noted that all projects exceed the pre-construction P90 estimate. The reasons for this discrepancy were identified, with the largest cause of error being wind flow and wake-modelling errors. Following a reassessment using up to date methodologies from 2018, the mean bias in pre-construction predictions was 1.4%.
HighlightsThe computational models comprising the current version of WinDAM, called WinDAM C, are summarized.WinDAM C estimates the response of an earthen embankment subjected to overtopping or internal erosion.WinDAM C is a model that quantifies erosion/breach processes observed in physical embankment failure tests.Understanding the current technology and limitations provides a basis for further model development.Abstract. Internal erosion and overtopping erosion of earthen embankments are the leading causes for earthen embankment failures. Challenges like reservoir sedimentation, structural deterioration, rodent damage or tree root growth, and changing hazard classification from low to significant or high have arisen with aging dams. To address these challenges, new technology and tools for predicting the performance of homogeneous, cohesive earthen embankments during overtopping or internal erosion are needed. Windows Dam Analysis Modules (WinDAM) is a modular software application developed through collaborative efforts of the United States Department of Agriculture (USDA) Agricultural Research Service (ARS), the USDA-Natural Resources Conservation Service (NRCS), and Kansas State University (KSU) in response to this need. WinDAM uses a simple storage routing model to simulate flow through a reservoir and incorporates algorithms for predicting the progression of erosion resulting from embankment overtopping or flow through an internal discontinuity in the embankment. These algorithms are based on existing literature and data and observations from physical model experiments of homogeneous, cohesive embankments conducted by scientists at the USDA-ARS Hydraulic Engineering Research Unit in Stillwater, Oklahoma. The resulting computational model is a simplified representation of the observed process of progressive erosion that may lead to embankment breach. This paper reviews the components of the erosion/breach process and the way in which these components are quantified and integrated into the current WinDAM software, WinDAM C. The scope of application of the software, limitations, and computational assumptions are also discussed. Keywords: Breach, Dams, Erodibility, Erosion Process, Failure, Internal erosion, Model, Overtopping, Piping.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.