Objectives:The research aims at minimizing construction projects' costs, including solid slab materials (steel and concrete), by analyzing the slab's parameters and optimizing the slab design using the iteration method. Methods: Research data were given as thirty solid slabs. Excel spreadsheets were made according to the Saudi Building Code specifications to optimize the slab design automatically and determine the minimum amount of concrete and steel. Plugging of the given data was done in an iterated method while assuring that outputs are within the allowable limits till reaching the possible optimum design. Findings: Study results reveal that slab 4 and slab 5 have the lowest calculated cost ($7,825.33/m^2) even though they have different amounts of concrete and steel. The two parameters, the actual depth of the slab and the steel bar' diameters, played a significant role in slab cost reduction. It is recommended that slabs from (20) to (30) be designed as flat slabs due to the chance to increase concrete instead of the steel amount. Novelty: The study utilized the iteration method in construction cost optimization, which the previous studies related to the topic field had not used.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.