The appropriate layout of temporary facilities on a construction site has a large impact on construction safety and productivity. For the duration of a project the site layout may need to be efficiently re-organized at various intervals to satisfy the schedule requirements and to maintain site efficiency. This paper presents a practical model for schedule-dependent site layout planning in construction. The proposed model uses a combination of artificial intelligence tools (knowledge-based systems, fuzzy logic, and genetic algorithms) to generate, optimize, and re-organize the site layout plan at frequent intervals during the project. The model incorporates flexible representation of irregular site shapes and several options for placing facilities. Based on the proposed model, an automated system is developed, fully integrated with widely used scheduling software. At each schedule interval, the system recalculates the space requirements and, for the convenience of congested sites, can utilize parts of the constructed space to accommodate temporary facilities. Details of the schedule-dependent model are described, and its application in an actual case study project is presented to demonstrate its capabilities.Site Layout Quantitative Evaluation Material Flow,
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.