The construction projects in Pakistan have inherent problems of erroneous planning and schedule development. This dilemma has led to the failure of the majority of construction projects in Pakistan. Earlier researches have tried to curtail the increasing spectrum of inaccurate planning and schedule development. But not many research studies have shed light on the major factor of 2D CAD drawings interpretation problems, which are playing a key role in defective planning and scheduling. Moreover, the role of BIM, i.e., Building Information Modeling with respect to efficient planning, has not been also discussed in detail. This study has concluded a positive impact of BIM on effective planning and scheduling in the construction industry of Pakistan. About 210 responses were obtained from experienced construction professionals of Pakistan and tested via regression analysis in order to validate this argument. It has been analyzed that 2D CAD drawings are now getting primitive and 3D technology BIM is taking its place. BIM is an efficient tool for planning and scheduling. With the start of CPEC and Multi-Billion Dollar investment on infrastructure, construction industry of Pakistan needs to uplift its existing standard in order to meet with international requirements. For this purpose, BIM has been recommended. It will not only assist in attaining flawless planning but will also increase the success rate of CPEC projects in Pakistan.
The Construction and demolition (C and D) waste generation is a critical issue for the construction industry, which negatively affects the economy, environment, and society. This study estimates the penalty-cost based on the produced C&D wastes in steel and concrete skeleton projects. Field survey and the BOQ data were collected from five concrete and four steel skeleton projects. The difference of materials used and wastes generated between concrete and steel skeleton projects were evaluated statistically (ANOVA and Welch and Brown-Forsythe). A financial analysis was implemented for estimating the penalty cost. The study outcomes demonstrate that the amount of waste that construction managers estimated is significantly lower than the actual amount generated. Furthermore, 0.055% of the total project cost of a penalty was estimated based on the waste produced at construction sites. In the end, the estimated penalty was validated by comparing it with the six recent completed projects. The penalty calculated in this study could save the project cost and reduce the C&D waste. As a result, imposing the estimated cost as a penalty would force construction managers to think thoroughly about the generated C&D waste problems. This study also has a novelty and will add to the body of knowledge by using penalty-cost quantification model to save project-cost of construction material-based-waste, and it can be further explored by adopting more quality data and engaging different construction materials.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.