Difficulties in building new power lines in Italy because of authorization problems, and the production of electricity from renewable sources growing more and more, induces Terna S.p.A. (Italian TSO) to take advantage of existing overhead transmission lines. In order to increase the transmission capacity, Terna has used a software in GIS (Geographic Information System) environment which allows for the management of the interferences according to all the legislative bonds by referring to the LIDAR (Laser Imaging Detection and Ranging) remote sensing technology. This paper, after a description of the GIS and the LiDAR technology, shows how the calculation of the current capacity of some High Voltage power lines in Sicily is carried out by using the conductor thermal model. Relevant results concerning a general study of the characteristics of electrical conductors with high temperature performance and low sag are presented and these studies are applied to three overhead transmission lines.
High-voltage underground cable systems are becoming more common as the demand for electrical power within urban centers increase, also considering the difficulties in building new overhead power lines in the vicinity of city centers because of authorization issues. Therefore, interest towards the evaluation of magnetic fields produced by high-voltage power lines has been triggered during the last decade and concern about effects on human health of exposure to extra low frequency (ELF) magnetic fields due to power lines has been increasing as well. Hence, the evaluation of the magnetic field produced by underground power cables is important in order to develop methods for mitigating their influence on the surrounding environment. In this paper, after a description of some technical solutions adopted nowadays to reduce ELF magnetic fields generated by power cables, a case study on a 380 kV power line will be considered
Abstract:The exploitation of power lines currently in operation has now become a common practice among electric system operators. The construction of new power lines requires taking economic, political and social problems into consideration. This paper considers two methodologies adopted by the Italian Transmission System Operator (TSO), Terna S.p.A.: Dynamic Thermal Rating (DTR) and Laser Imaging Detection and Ranging-Geographic Information System (L-GIS). DTR systems dynamically calculate the real transport capacity of a power line. The L-GIS system allows, after the geo-referencing of the power line, the management of any interference between the line and the nearby obstacles, permitting the optimization of the high voltage line operation. In this paper, after a brief illustration of the two methods, the authors report the results of some applications in the Sicilian electrical power High Voltage (HV) system.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.