A complex brown-field cluster in South Oman showed decline in production despite aggressive level of development and infill drilling over the last few years. This cluster has more than 18 fields, with 10 of them are producing. Different major reservoirs distributed across several stratigraphic horizons and contains moderate to highly viscous oil ( 10 to 400 cP). The reservoirs comprise unconsolidated fluvial, fluvial deltaic and glacial sandstones of Palaezoic age. The geologically complex field due to large number of faults and fractures has been on production of
XBU is an offshore mature oil fields area which has been produced more than 40 years. There are three fields as main producers from this area; they are CC, RR, and WW. Reservoir pressure in the main reservoirs were originally more than 1700 psi, and by the time it was decreasing to 300 – 500 psi, so many wells in XBU could not be produced due to gas problem and low influx. In the well which had reservoir pressure below bubble point, in every drawdown of ESP, the gas would release in fill the column of annulus in the wellbore. If the casing pressure is close or flow to the system riser pressure of the platform, the column of gas would push the fluid level in the wellbore and make problem of the pump (gas lock, pump off, slug flow, etc). Production operation and engineers then came up with a solution of modification in the surface production facilities by installing venting system through scrubber in the platform which has gas problem wells. By venting the casing pressure to the scrubber and vented to the atmosphere, the production of each well was stable and ESP runlife was longer. This equipment also needs to pass QHSE requirement since almost all of them were located in the unmanned platform. Preliminary study of this project came from several finding of gas problem in almost all XBU wells. Short ESP Runlife also caused by this problem. Design of venting system though scrubber was created by the team with some constrain and must meet safety and technical requirement. Installations of the design were widely applied in year 2008 to 2009. The basic principle of this technology was to make fluid column in the casing as big as possible, so the maximum fluid level can be drawdown by ESP. It can be indicated by having casing pressure as low as possible and increasing flowing bottomhole pressure. This method proved can maintain the decline rate of XBU oil production from 2008 to 2017. Better ESP runlife for problem wells due to gas also can be a parameter of the venting installation success. NWA B-07 and SWW A-03 wells which previously shut in and could not be produced due to categorized as gassy well were an example for proving the methods, those well can be back online after installing venting system through scrubber. This paper will elaborate the general problem of offshore mature oil fields both sandstone and limestone, especially the depleted reservoir which has gas problem. Installing gas venting system through scrubber proved can maintain oil production for about 10 years and even more.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.